PORTFOLIO

Summary of Ongoing Projects

Heading 1

SQWEC

Shuqiaq Power Plant

Date: April 2023

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning & Commissioning of IDAS & LRDAS, and Start-up

Large Project 

7c66a4a8-4779-4327-bfa0-9a142c61f041.jpg

GASCO

Security Upgrade Project (Qassim & Madinah)-Phase 2

Date: October 2022

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Large Project 

Security Surveillance

SAUDI ARAMCO

Jizan Bulk Plant and Jizan Refinery Security Radars & Camera

Date: July 2021

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning & Commissioning of IDAS & LRDAS, and Start-up

Large Project 

unnamed.jpg

Hyundai

Uthmaniyah Gas Plant Security System Upgrade

Date: July 2021

Procurement, Installation, Supervision, Commissioning of CCTV and Integration

Small Project 

aramco-khurais-facility.jpg

SAUDI CHEMICAL (SCC)

Security System Upgrading and Patrol Road Asphalting

Date: June 2021

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Large Project 

Clint+03-21-19_Page_2.jpg

SAUDI ARAMCO

General Services Contract

Date: September 2025

Preventive Maintenance, Corrective Maintenance, Logistics, SW update, and Support

Large Project 

842366-200.png

SAUDI ARAMCO

Haradh Hawiyah Gas Compression Plants Security Package

Date: October 2022

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Large Project 

1-11.jpg

SAUDI ARAMCO

Upgrade Berri Junction Class 1 Facility

Date: December 2021

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Large Project 

oilrefinery3.webp

SAUDI CHEMICAL (SCC)

Atshana Plant

Date: December 2020

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Large Project 

Image by Ant Rozetsky

Alfa AlKahleej - Hyundai

Marjan Segregation Works Package #6 (MSW-P6) Temporary Area

Date: May 2021

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Medium Project

download (2).jpg

Summary of Completed Projects

SAUDI ARAMCO

Khurais CPF and Abu Jifan GOSP Security Package

Date: March 2020

Detail Engineering, Procurement, Construction, System Installation, and Testing, Pre-commissioning, Commissioning and Start-up

Image-1-Khurais-Oilfield-Expansion-Saudi

Large Project 

SAUDI ARAMCO

General Services Contract

Date: September 2020

Preventive Maintenance, Corrective Maintenance, Logistics, SW update, and Support

Measurement Services

Large Project 

POSCO

Wasit Pipe Crossing

Date: July 2018

Engineering Support and Verification, Procurement, System installation, and Testing, Pre-commissioning, Commissioning and Start-up

Pipe Machining and Cutting

Small Project 

NESMA Trading

RT Gate #45

Date: November 2018

Engineering Support and Verification, Procurement, System installation, and Testing, Pre-commissioning, Commissioning and Start-up

Security Gate

Small Project 

SAUDI ARAMCO

Jazan Security Package

Date: March 2020

Detail Engineering, Procurement, Construction, System Installation, and Testing, Precommissioning, Commissioning and Start-up

project-jazan-gallery-3.jpg

Large Project 

SAUDI ARAMCO

ISUP

Date: December 2013

Design, procure, construct, install perimeter security systems at 28 Class I,2 oil and gas facilities

On Site Gas Production

Mega Project 

SAUDI ARAMCO

A4/5 (ISUP Amendment)

Date: December 2013

Design, procure, construct, and integrate legacy systems at 18 more sites.

Design Sketch Desktop

Large Project 

SUMITOMO

Manifa LRDAS and IDAS Security Project (ARAMCO)

Date: June 2014

Design, procure, construct, and install LRDAS and IDAS Perimeter Security for SAUDI ARAMCO facility in Manifa Land and Marine. Including the Manifa Causeway (2 Sites)

da8a895858d26fdf25b930485894d7e3.jpg

Large Project 

PETROFAC

Karan LRDAS Security Project (ARAMCO)

Date: October 2013

Design, procure, construct, and install LRDAS Perimeter Security for ARAMCO facility

Image-1-Ras-Tanura-Refinery-Expansion.jp

Large Project 

Dragados

Ras Tanura Pipe rack

Date: June 2017

Design review, installation, configuration and testing of newly installed cameras and sensors

Pipes

Small Project 

SEPCO

Shaybah GOSP 4 Expansion

Date: June 2017

Design review, installation, configuration, and testing of newly installed cameras and sensors

Shaybah.png

Large Project 

Bonatti

Juyamah Pipe Rack

Date: April 2017

Design review, installation, configuration and testing of newly installed cameras and sensors

Pipe Machining and Cutting

Small Project 

Yasref

Yanbu Refinery Pipe rack

Date: November 2016

Design review, installation, configuration, and testing of newly installed cameras and sensors

Pipe Testing

Small Project 

Khonaini International

RT Community Expansion

Date: November 2018 

Engineering Support and Verification, Procurement, System installation, and Testing, Pre-commissioning, Commissioning and Startup

DSC01955-e1549882236323.jpg

Small Project 

Dragados

Ras Tanura Pipe rack

Date: June 2017

Design review , installation, configuration and testing of newly installed cameras and sensors

Image by Clayton Cardinalli

Small Project 

SEPCO

Shaybah GOSP 4 Expansion

Date: June 2017

Design review , installation, configuration and testing of newly installed cameras and sensors

DSC_9060s.jpg

Small Project

clients 

Maaden_edited.jpg
LOGO-1.jpg
SWCC logo.jpg
daco2.jpg
954353.jpg
Saudi-Aramco-logo.jpg
320px-SABIC_Logo_RGB.png
56743_1522854047.jpg
SBM.png
0.png
Nesma Trad.png
Power-and-Utility-Company-for-Jubail-and
stc.jpg
1bfc686.jpg
Royal Commission for Al Ula.png
Neom-Logo.png
741.jpg
225.jpg
14.jpg
222.jpg
5.png
2.png
3.png
1.jpg
1452.jpg